Industry

Argentina cancels energy infrastructure plans

Argentina has postponed or canceled two of its biggest energy infrastructure projects as policymakers debate measures to protect the country’s oil industry. The tender to build the central gas transport system, a gas pipeline meant to boost capacity from the Vaca Muerta unconventional formation, has been postponed for a third time. Concurrently, the tender to build the Río Diamante-Charlone transmission line, a US$560mn project, was cancelled.

Source: BNAmericas